Skip to product information
1 of 7

GOOZEEZOO

GOOZEEZOO GA490 DESHIBO Portable Active Loop Antenna 100kHz-179MHz MW/SW/Air Shortwave Radio Antenna Suitable for Desheng/Sangean/Malachite/TEF6686 Radio with 2600mAh battery

GOOZEEZOO GA490 DESHIBO Portable Active Loop Antenna 100kHz-179MHz MW/SW/Air Shortwave Radio Antenna Suitable for Desheng/Sangean/Malachite/TEF6686 Radio with 2600mAh battery

Regular price $48.00 USD
Regular price Sale price $48.00 USD
Sale Sold out
  1. 【Upgrade Version】 For urban residents, the radio reception experience is often disappointing. We can hardly hear any useful signals. Signals are buried in many different types of interference and buzzing. The GA490 antenna can solve this problem. It is an effective antenna for SWL and HAM to receive MW and SW in the environment of limited living areas in cities.
  2. 【Wide Frequency】 Frequency coverage: 100kHz-179MHz. It can can hear tons of stastions. When used for ordinary radio reception, the shortwave effect is very obvious, and when used for frequency modulation, it can be used as a passive antenna, and the effect is also quite good
  3. 【Avoid Noise】 This sdr loop antenna has built-in signal amplification circuit and noise suppression circuit, which can effectively amplify the signal and reduce the impact of noise.
  4. 【Easy to Assemble】. The active shortwave antenna is very easy to assemble, lightweight, and is easily transportable. GA490 antenna has a diameter of 50CM and can be installed outdoors, on balconies, and rooftops without occupying too much space. It is a great best shortwave radio antenna for those who have no space for a bigger antenna.
  5. 【Suitable Models】The SDR Loop Antenna suitable for Desheng S-2000/600/990/880/501;RD1780/1860; Sangean909x2; Malachite Radio; TEF6686 Radio and all other shortwave receivers
  6. 【Package List】1x Outdoor Antenna Box; 1x indoor Power Box; 1x Cable Connection; 1x Bnc Connector; 1x Charging Cable; 2x Adapter(SMA & F Connector); 2x Rod Bracket
View full details